InfoisInfo Australia

Northern Group Pty Limited
Fencing in Warringah

www.northerngroup.com.au
Show phone number
Remember you found this company at Infoisinfo 2-9972580?

Address

1 Dumic Pl. Cromer. Warringah, NSW, 2099.
Show map


Are you the owner or manager of this company?



What you should know about Northern Group Pty Limited

Construction in Warringah

Northern Contracting Group provides the maximum of standards in Project Delivery. Together, the Northern Contracting Group team forms a multidisciplinary company bringing knowledge, experience, collaborative thinking, passion and a non adversarial approach to each project. Northern Contracting Group operates a government accredited management system ensuring reliability and triumphant project outcomes on each and every occasion. We have a diverse portfolio of experience demonstrating our ability to face the demands of intricate and detailed projects across domestic markets Australia Wide. Northern Contracting Group are a entire civil contract service provider specializing in courteous contracting and plant hire packages.

Northern Contracting Group undertakes full at grade vehicle park construction with a variety of finished surfaces. Northern Contracting Group provides stuffed delivery services, supported by owned and operated plant and equipment. The project needed Northern Group to undertake civil works consisting of trim, grade and compaction of existing sub grade lower Slick 1 Geo technical supervision, sub base and bottom preparation, asphalt surfacing with 40mm thick AC10, tangible Serbs and gutters, definite footpaths, pram ramps, driveways and vehicle crossings, subsoil drainage works with 100mm socked agline and the submission of as built drawings for a 1200m2 loop road with street parking to service townhouses lower construction. Along with this labor upgrades of the exiting Serb and guttering, drainage infrastructure and council footpath were required. Northern Contracting Group provided and stuffed civil works package for this project, undertaking all ground and retaining works for the client. In this case the developer wished to have no involvement in the coordination and management of site works, therefore Northern Contracting Group provided a lump sum package for site clearing, bulk excavation, detailed excavation of footings and drainage, shoring piling and shot crating retaining systems. Once construction of retaining walls, ground slabs and unsuspended slabs had been achieved Northern Contracting Group provided small excavation equipment for back filling to retaining walls and gardens areas. This project required demolition and removal of existing dilapidated car park surface, including bitumen area, tangible Serbs and redundant drainage services. Northern Contracting Group (sync) provided fulltime supervision, labor and equipment to manage and undertake all works other than concrete and asphalt. Northern Group’s works packages involved demolition, bulk excavation, importation of compact capable fill (sandstone), construction of reinforced concrete piers, preparation of DGB20 sub base, edge thickenings, jointing, concreting, saw (Goff) cutting, joint sealing and spray on curing. Construction of reinforced tangible retaining wall footing. Once installed Northern Group constructed the new reinforced concrete driveway with integrated barrier Serb for completion of the project. In conjunction 1500m3 of bulk excavation was needed to the eastern property boundary to accommodate the playing surface area and 150m3 of detailed excavation for retaining wall footings and the like. Northern Contracting Group’s scope of works was minor demolition and fence removal, strip and remove the existing grass, excavation and remove offside the existing sub grade material, import and compact sub bottom and bottom material, install slip form tangible Serb only and Serb and gutters, provisions for power and irrigation, preparation of landscaped areas, asphalt surfacing and pavement ancillaries. Bulk excavation to reduced levels proceeded this with the use of a Cat 324 excavator, Cat 312 excavator, Barford articulated dump truck and truck and trailer for cartage and disposal. Northern Contracting Group provided all cartage and stockpile handling throughout the bulk excavation segment of the project. At the completion of bulk works Northern Contracting Group installed entire hydraulic works servicing the car park and roof area of the HQ. The project needed demolition and removal of existing dilapidated vehicle park area, including bitumen surface area, concrete Serbs and redundant drainage services. Northern Contracting Group provided fulltime supervision and equipment to manage the works, which also extended the vehicle park area to accommodate fresh parking bays for up to ten cars. The project was undertaking all courteous works involved with delivery the project. The package included demolition of existing dilapidated parking area, excavation for sub pavement layers, supply store and compact bottom and sub bottom and laying of 50mm AC10 surface. The project required the saw cutting and demolition of 100m2 of existing asphalt surface and 100m2 of reinforced tangible surface. Polite Construction projects varying widely in scope and difficulty, Northern Contracting Group will undertake the simplest of pro
Read more...

Social media

Photos and videos

This business has no pictures or videos

Reviews of Northern Group Pty Limited (0)

Do you own a business?
We help you grow it

Get more clients, visibility and branding.
Let us help you achieve your targets and improve your business.

Add your company